I will be starting to actually do some work on this.We finally got Tim's old '81 stripped and hauled off.So now I can move my project over to Bill's shop and get something done.
1. thing to do,is to weld the rear cab mount brackets on,remove the BL and install new bushings
2. will be making mount brackets for the trans x-member,then install the bucket seats so I can cut the hole for the second shifter.Then install the doublers,twin stick and trans
3. will be to secure the temporary fuel source.
4.weld the sliders in place
If I can get this stuff done I'll be good to go.The propane will have to be one of the last things I do.The cost of doing the exo-cage is going to be close to wiping out my build budget.The price of steel just keeps going up and the fact that the part of the cage that surounds the cab has to be DOM. The back half and the front clip can be HREW or even poop pipe for all I care but the cab has to be all but indestructable.I don't want to be second guessing my safety in that area.I will be rolling this rig there isn't one doubt in my mind about this.I have never rolled but my time is due and I want to be able to welcome it with open arms(as long as my arms are inside the cab)

I will do what I can about taking pics but we are some of the worst when it come to documenting what the hell it is we're doing.